The Tata Intra V30 is a smart pickup from Tata Motors, built on the ‘Premium Tough’ design philosophy. These commercial vehicles deliver robustness and reliability, in a compact and attractive design. Because of its 4 cylinder engine & rugged aggregates, for the Tata Intra V30, high loads and long leads aren’t a worry. Here’s a closer look at the features of this pickup: A powerful engine with improved fuel-efficiency The Tata Intra V30 smart pickup truck comes with a new BSVI compliant DI engine generating 52 kW (70 HP) of power and 140 Nm of torque. It has a top-notch gradeability of 37%. The Intra V30 also has an eco-switch and a gear shift advisor increasing its fuel efficiency and performance. Not just that, but the pickup comes with two driving modes: ECO and NORMAL. It is very easy to switch between these two modes with the help of a button on the dashboard. The pickup provides upgraded fuel economy when switched to ECO mode whereas NORMAL mode can be used for steep gradients, loaded conditions, city traffic, etc. This makes the Tata V30 incomparable in mileage, and your savings. A loading area and capacity built for maximum earnings The Tata Intra V30 has a loading area of 2690 mm x 1607 mm (8.8 feet x 5.3 feet), a rated payload of 1300 kg and strong leaf spring suspension that makes it easier to load and unload cargo. It also has bigger tyres of the 185 R14 type, making it easy to drive even on bumpy terrains. A bigger loading area and comfortable driving experience ensure maximum profits for pickup owners. Its chassis frame, manufactured using hydro-forming process and superior robotic facilities, delivers high standards of quality as well as sturdiness. Owing to lesser number of welding joints on the chassis, the structural strength and durability of this pickup is high. Hence, this pickup can be deployed in long lead as well as heavy load applications. Enhanced comfort to make long trips with ease This pickup provides high levels of comfort and ease for the driver, thanks to its electric power-assisted steering and a turning circle radius of 5.25 m. This makes it easier to maneuver the vehicle and make it easily deployable, even on crowded city roads. It accelerates from 0 to 60 kmph in 13.86 seconds, hence substantially reducing the turnaround time and increasing the potential for multiple trips. As for the interiors, the Tata Intra V30 has a bigger and wider walkthrough cabin space, as well as a passenger’s seat alongside the driver. To enhance the driving experience, this pickup comes equipped with a dashboard-mounted gear lever, various pedals, levers and controls at an easy reach for the driver. All of these features backed by the ever-reliable Tata Motors brand, surely makes the Tata Intra V30 a smart purchase that sets you up for success.

How-the-Tata-Intra-V30
Reading time: 0 min

The Tata Intra V30 is a smart pickup from Tata Motors, built on the ‘Premium Tough’ design philosophy. These commercial vehicles deliver robustness and reliability, in a compact and attractive design. Because of its 4 cylinder engine & rugged aggregates, for the Tata Intra V30, high loads and long leads aren’t a worry. Here’s a closer look at the features of this pickup: A powerful engine with improved fuel-efficiency The Tata Intra V30 smart pickup truck comes with a new BSVI compliant DI engine generating 52 kW (70 HP) of power and 140 Nm of torque. It has a top-notch gradeability of 37%. The Intra V30 also has an eco-switch and a gear shift advisor increasing its fuel efficiency and performance. Not just that, but the pickup comes with two driving modes: ECO and NORMAL. It is very easy to switch between these two modes with the help of a button on the dashboard. The pickup provides upgraded fuel economy when switched to ECO mode whereas NORMAL mode can be used for steep gradients, loaded conditions, city traffic, etc. This makes the Tata V30 incomparable in mileage, and your savings. A loading area and capacity built for maximum earnings The Tata Intra V30 has a loading area of 2690 mm x 1607 mm (8.8 feet x 5.3 feet), a rated payload of 1300 kg and strong leaf spring suspension that makes it easier to load and unload cargo. It also has bigger tyres of the 185 R14 type, making it easy to drive even on bumpy terrains. A bigger loading area and comfortable driving experience ensure maximum profits for pickup owners. Its chassis frame, manufactured using hydro-forming process and superior robotic facilities, delivers high standards of quality as well as sturdiness. Owing to lesser number of welding joints on the chassis, the structural strength and durability of this pickup is high. Hence, this pickup can be deployed in long lead as well as heavy load applications. Enhanced comfort to make long trips with ease This pickup provides high levels of comfort and ease for the driver, thanks to its electric power-assisted steering and a turning circle radius of 5.25 m. This makes it easier to maneuver the vehicle and make it easily deployable, even on crowded city roads. It accelerates from 0 to 60 kmph in 13.86 seconds, hence substantially reducing the turnaround time and increasing the potential for multiple trips. As for the interiors, the Tata Intra V30 has a bigger and wider walkthrough cabin space, as well as a passenger’s seat alongside the driver. To enhance the driving experience, this pickup comes equipped with a dashboard-mounted gear lever, various pedals, levers and controls at an easy reach for the driver. All of these features backed by the ever-reliable Tata Motors brand, surely makes the Tata Intra V30 a smart purchase that sets you up for success.